• Installation is the final stage of the process. Several members of our team will deliver the granite countertops and we'll install them on cabinets. We will also install the sink and other necessary hardware. Our installation does however exclude plumbing and electrical work.
Approximately 10 business days after templating, the top will be fabricated and ready for installation. We will contact you to arrange for a date and time for the installation process. Our installers will arrive at the jobsite as early as possible. This may fluctuate depending on jobsite location and the drive time required. Installation may normally take one day, but there are some large jobs that take longer to finish. Our installers are artists; they must create a piece that is durable and visually stunning. We strive to be diplomatic and pleasant when installing your chosen stone.
The installation area should be free of construction materials and appliances. This allows our crew to come in and immediately go to work. The jobsite should have water and electricity available to the installers. We are not licensed to work on plumbing or electricity. Others must handle all water and electrical disconnections.
When your granite or marble counter has been installed and cleaned, our technicians will apply a penetrating sealer to the surface of the countertops. Installation is now complete. Before our crew leaves the jobsite we will be sure the work area is clean.
We want to be certain you or your client is satisfied. Please make a final inspection of your job.